Project Implementation Date Project Name Facility
06/2014-01/2015 Computer-aided process control system ТРP-4 Ulaanbaatar city
07/2014-04/2015 Technical upgrade of steam condensate system Orgkhim
08/2014-02/2015 Design and manufacturing of condensate recovery, purification and transfer package unit Stavrolen
09/2014 Cross-flow cooling tower automation system design and integration, including installation supervision and commissioning works Novokuibyshevsk Oils and Additives Plant
10/2014-05/2015 Automation of water circuit cooling tower EuroChem — Belorechenskie Minudobrenia
11/2014-03/2015 Design and survey works to support redesigning of Vostochnaya 110 kV Substation IDGC of Centre
10/2015-12/2015 Commissioning for data collection and transmission system (DCTS) at Eletskaya 500 kV Substation Federal Grid Company
11/2014-01/2016 Borskaya 220 kV Substation integrated technical upgrade and redesign Federal Grid Company
01/2015-10/2015 Commercial metering system audit Federal Grid Company
07/2014-07/2015 Design and manufacturing of VSD control cabinets for Chelyabinskaya regional power plant Fortum
01/2015-06/2015 Development and implementation of Automated Measuring and Information System for Electric Power Fiscal Accounting for distribution network on Valaam Island MRSK Severo-Zapada
03/2015-06/2015 Development and implementation of Automated Measuring and Information System for Electric Power Fiscal Accounting for 6/0.4 kV distribution network on Valaam Island Federal Grid Company
07/2015-12/2016 Redesign of steam condensate system on turnkey basis Kuibyshev Refinery
04/2015-09/2016 Ultrasonic gas flow metering system integration for Tyumenskaya TPP-2 power plant Fortum
07/2015 Development and integration of an Automated Measuring and Information System for Electric Power Fiscal Accounting and System of Technical Data Exchange with Automated System of System Operator within the Sovgavanskaya TPP power plant under construction RusHydro
07/2015-04/2016 Design and manufacturing of dry ash handling equipment for Blagoveshenskaya TPP RusHydro
06/2015-09/2016 Upgrade of utility infrastructure and automation systems for Novoye oil-field and oil pipeline Oil Company Priazovneft
09/2015 Design project for TPP Electrical Shop Upgrade Mondi Syktyvkar
09/2015-07/2016 Reconstruction of 10/0.4 kV supply mains, arrangement of temporary power supply to 10 kV distribution transformer substation from existing HV 10 kV line NPO Nauka
10/2015-12/2015 Feasibility study of upgrade of main building power supply system considering future development and process optimization Borkhimmash
02/2016-08/2016 Turnkey elaboration and implementation of Catalytic reforming unit upgrade Komsomolsk Refinery
12/2015-12/2016 Turnkey design and implementation of condensate units Angarsk Petrochemical Company
11/2015-11/2015 Feasibility study for integration of an Energy Resources Automated Operational and Dispatch Control Kazakhmys
12/2015-02/2017 Technical upgrade of RP-13 10 kV distribution substation of phosphorous production facility PhosAgro-Cherepovets
12/2015-11/2016 Automation of water circuit twelve-section cooling tower of power shop at OOO EvroKhim-BMU, including installation supervision and pre-commissioning activities EuroChem — Belorechenskie Minudobrenia
01/2016-12/2016 Design, installation and setup, personnel training, and commissioning of a Central Automated Operational and Dispatch Control Novomoskovskiy Azot Eurochem
04/2016-12/2016 Technical upgrade of gas burners ignition system for steam boilers at Tyumenskaya TPP-2 power plant Fortum
01/2016-06/2016 Design and manufacturing of VSD control cabinets for Chelyabinskaya regional power plant Fortum
05/2016-06/2016 Condensate system audit Angarskaya Petrochemical Company
09/2016-11/2016 Design, installation supervision and commissioning activities for construction of Fiber-Optic Communication Line in Norilsk RN-Vankor
06/2016-11/2016 Design project for upgrading steam supply system at LUKOIL-Nizhegorodnefteorgsintez to support an automated adjustment and control of heating network parameters Lukoil
11/2016-02/2017 Upgrade of TP65-11 Transformer Substation of Phosphorous Production Facility PhosAgro-Cherepovets
07/2016-03/2017 Installation and setup of electric driven HP feed pumps for Severo-Zapadnaya TPP Inter RAO
08/2016-09/2016 Replacement of turbine-driven feed pumps at power generation unit of Nazarovskaya regional power plant Siberian Egeneration Company
07/2016-12/2016 Technical upgrade of transformer substation KTP-78 (Building 809/3A) and electrical distribution unit ERP 2Sh (Building 810) of urea plant TsPM-2 PhosAgro-Cherepovets
06/2016-12/2016 Installation of fire alarm systems, automatic fire extinguishing systems, and PA and evacuation systems at Ust-Khantaiskaya hydro power plant Norilsk-Taymyr Energy Company
09/2016-12/2016 Integration of condenser ball cleaning system (BCS) for Severo-Zapadnaya TPP Inter RAO
08/2016-12/2016 Installation of fire alarm systems, automatic fire extinguishing systems, and evacuation systems ZSK
08/2016-12/2016 Automatic frequency and capacity control system adjustment as part of pulverized-coal system upgrade at Nazarovskaya regional power plant Siberian Generating Company
09/2016-12/2016 Turnkey integration of variable speed regulation for the network pumps drives for the needs of Kostromskaya regional power plant Inter RAO
10/2016-03/2017 Design, survey, construction, installation, and pre-commissioning activities for arrangement of power supply for conveyor from an outdoor ore storage APATIT
12/2016-01/2017 Parafin units process scheme upgrade at Omsk Lubricants Plant Gazpromneft