The upgrade was driven by the physical and moral depreciation of compressors and the desire to transfer equipment from air to water cooling.
Engineer One had dismantled obsolete equipment and installed six new high and low pressure compressors. We also have designed and successfully implemented the compressor control systems.
New compressors will help the Mainskaya Hydro Power Plant to reduce operating and repair costs and increase compressed air supply systems reliability.